ID 527656

Archived

5280 North Powers Ferry Road Phase 1 Streambank Repair and Culvert Replacement Project, Sandy Springs GA

Fulton County

Owner Reference: 20-049

Bid Date: 03/02/2020 at 02:00pm

The existing storm pipe network near 5280 North Powers Ferry Road is in need of replacement. The existing pipe network comprises of an existing 36” Corrugated Metal Pipe (CMP) as well as a 24” CMP that convey a stream near the property. These pipes and a junction box will be removed and the streambanks restored. In addition, there is an 18” CMP pipe that drains the cul-de-sac and discharges into the same network. The existing pipe will be replaced with 18” Reinforced Concrete Pipe (RCP) with a new precast manhole and headwall. Additionally, the double-wing catch basin at North Powers Ferry Road will be replaced. Associated design elements include replacing damaged curb and gutter as well as installing and maintaining sediment control measures per approved plans number PW19- 00003 R1. The selected contractor shall be able to start work within ten (10) calendar days after the “Notice to Proceed” is issued. The time of completion for the project is ninety (90) calendar days from the date of the “Notice to Proceed.” Bonds will be required for this project.

City of Sandy Springs

Delores Hill
 (770) 730-5600
 Login or create an account To view email

Published 02/05/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.