Battery Energy Storage System (“BESS”), Oakland, CA

Alameda County

Owner Reference: 23-24/27

Bid Date: 06/06/2024 at 11:00am
30 Days until bid date

Pre-Bid: 05/07/2024 @ 09:00am

Trades: *A&E Professional Services: Architecture, Engineering, Consulting & Planning, Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

The Seller will be responsible for providing a fully functional turnkey BESS and associated work and services as described in the Scope of Services below. 1. BESS Procurement 1.1. Furnish the labor, materials, equipment, engineering, design, supervision, and any services required for procuring, fabricating, manufacturing, transporting, delivering, testing, and commissioning a lithium-ion Battery Energy Storage System (“BESS”) as specified in Exhibit A RFP 23-24/27, Page 1 of 14 – BESS Technical Requirements, for behind-the-meter interconnection and full integration to the Airport’s power distribution system. 1.2. 1.3. 1.4. Procure and furnish all electrical equipment up to and including the Power Conversion System (PCS), metering, DC cabling, control/communications wiring, network equipment and switches, battery cooling/HVAC system. Provide Quality Assurance/Quality Control (QA/QC) Program documentation. All onsite QA/QC testing procedures shall be witnessed and documented by a qualified representative of Seller. The Port shall observe and witness QA/QC as necessary and at its discretion. Provide proper shipping, handling, delivery, storage, and security of BESS and all of its components to ensure successful installation of the BESS. Seller shall be responsible for receiving, protecting, moving and storing all material at the project site in a safe and secure manner that maintains temperature control for battery cells and modules required under warranties. Representatives of both the Seller and the Port shall be present at the delivery site for purposes of visual inspection and approval. Fully integrated climate controlled system should be built in before battery modules arrive on site as well as other OEM recommended requirements to guarantee temperature controls are maintained for battery cells so that warranties are not violated. Bonds required. Prevailing wages.

Nickulaus Sioson
 Login or create an account
 Login or create an account

Owner: Port of Oakland CA

Published 04/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.