ID 705532
Alameda County
Owner Reference: ST0517
05/16/2024
Past bid date
Pre-Bid: 05/02/2024 @ 10:00am
Estimate: $1,500,000 - $1,650,000
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: modification to existing pedestrian curb ramps, modifications to curb radiuses, minor civil improvements, installation of foundations, signal poles, posts, pull boxes, wiring, push buttons, and other items of work which are required for installation of Rectangular Rapid Flashing Beacons (RRFBs) at three locations on Grafton Street and Antone Way, Central Parkway and Aspen Street, and Amador Valley Boulevard and Burton Street, and modifications to existing traffic signal at Central Parkway and Hibernia Drive, consisting of installing new traffic signal poles and foundation, traffic signal equipment, pull boxes, traffic signal conduit, conductors and cables, street lighting, installing sidewalk, curb and gutter, ADA curb ramps, and reconstruction drainage inlet, as shown on the plans, described in these Special Provisions and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars. Bonds required.
Oliver Castillo
Login or create an account
Login or create an account
Owner: City of Dublin CA
Published 04/28/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.