Project Management Services - Equalizer Tank Project, Paradise, CA

Butte County

Owner Reference: 24-02

05/01/2024
Past bid date

Trades: Project Management PM

The Consultant shall be responsible for the following scope of work: Project Management Services to include all necessary services from the issuance of the RFP for construction through the completion of the Project. This is a public works project as defined in the California Labor Code and must comply with all necessary requirements. Including: Review and issue RFP put together by District. Conduct pre-bid meetings with potential bidders. Review pre-bid questions, and issue necessary clarification and interpretation of the contract documents in consultation with WaterWorks Engineering. Issue any necessary addendum to the bid package. Collect bids. Evaluate bids along with District staff. Present bids to District Board of Directors. Prepare and issue Notice of Award of Contract. Prepare and issue Notice to Proceed. Collect and approve all submittals, RFIs, RFCs, etc., in consultation with WaterWorks Engineering. Review contractor’s progress payment requests and provide recommendations regarding payment in accordance with the work completed and the contract documents. If a change order request is presented by the contractor, review the request, communicate with PID, and provide a recommendation to the District staff. Maintain current records and documentation for all change orders, along with changes in contract days and contract dollar amounts. Establish and hold regular weekly progress and coordination meetings with PID and the contractor at the site during active on-site construction phase. Monitor contractor’s compliance with submitted schedule. Summarize Project progress and include the status of change order, contract days remaining, work completed, adherence to schedule, and work in progress. Construction/Project management onsite during construction. Visit the site during the active on-site construction phase as necessary to observe the work and document compliance with plans and specifications. Confirm that materials and installation methods used are specified in approved submittals or the contract documents. Conduct all necessary inspections. Obtain record drawings from the associated design professionals based on as-build drawings and site observation logs for District records. Review construction for adherence with the Project plans and specifications. Verify that all requirements of the contract are complete for final payment of retention funds to the contractor. Oversee startup and completion/sign over of the Project to the District.

Bill Taylor
 Login or create an account
 Login or create an account

Owner: Paradise Irrigation District (PID) CA

Published 03/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.