Pinon Trunk Sewer Capacity Phase 2 Project (CIP Project No. SS2401), Pinole, CA

Contra Costa County

Owner Reference: SS2401

Bid Date: 06/04/2024 at 02:00pm
15 Days until bid date

Estimate: $4,750,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

The work includes: Replacing existing and/ install new sanitary sewer pipelines by open-trench, Replace existing sanitary sewer pipelines by pipe bursting, Install new sanitary sewer casing by pilot tube guided auger bore, Sawcutting, Excavation, Backfill, Reconnecting laterals, Manhole replacement Manhole and Sewer Pipe abandonment Asphalt concrete and portland cement concerete restoration, CCTV inspection, Traffic control, and Bypass pumping. ALL WORK WITHIN RAILROAD RIGHT-OF-WAY must be completed within fifty (50) working days from the day work starts within the railroad right-of-way. FINAL COMPLETION OF ENTIRE PROJECT shall be completed within one hundred and eighty (180) working days after the commencement date stated in the Notice to Proceed. Bonds required. Prevailing wages.

Sanjay Mishra
 Login or create an account
 Login or create an account

Owner: City of Pinole CA

Published 05/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.