Pre-Paint Repairs at Hoover Middle School (Deferred Maintenance), Long Beach, CA

Los Angeles County

Owner Reference: FAC25-2324

Bid Date: 05/16/2024 at 02:00pm
15 Days until bid date

Pre-Bid: 04/30/2024 @ 09:00am

Estimate: $450,000

Trades: Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

The Project consists of: Provide all labor, equipment, and miscellaneous materials for the repair of existing roof, repair of damaged/cracked stucco, removal and replacement of rotting posts, siding from bungalows to be replaced with cementboard siding, and replacement of gutters with Weatherweld system. Work is located at Hoover Middle School located at address above. DVBE goal is 3%. Bonds required. Prevailing wages.

Erica Bonilla
 Login or create an account
 Login or create an account

Owner: Long Beach Unified School District CA

Published 04/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450