CSA 50 - Dunnville Estates - Community Gate Construction, Hollister, CA

San Benito County

Owner Reference: CUPCCAA-2024-1

03/29/2024
Past bid date

Pre-Bid: 03/15/2024 @ 09:00am

Trades: Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

The construction will span a 60.5-foot gap across Four Corners Drive, a private roadway which connects San Felipe Road and Dunnville Way. The gate will provide controlled access for vehicular traffic as well as pedestrian traffic. The gate will be constructed to provide a vehicular entrance of one 16-foot swing gate section providing a 16-foot-wide driving path for entry to the development. Similarly, the vehicular exit will also be constructed of one 16-foot swing gate section providing a 16- foot-wide driving path to exit the development. The project will be constructed to provide one pedestrian path through the gate on the south side of the main vehicular entrance gate. Bonds required. Prevailing wages.

Arielle Goodspeed, Principal Planner, via email
 Login or create an account
 Login or create an account

Owner: County of San Benito CA

Published 02/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.