Recycled Water for California Street Orange Groves Project, Redlands, CA

San Bernardino County

Owner Reference: S531021

Bid Date: 05/29/2024 at 02:00pm
9 Days until bid date

Estimate: $350,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C34 - Industrial Pipeline Contractor: Oil, Gas, Petroleum & Related Structures - General Engineering Contractor

Contractor shall furnish all materials and will perform all of the work for the following: Recycled Water for California Street Orange Groves Project, complete all items as required by the Contract Documents and Specifications for City’s Recycled Water for California Street Orange Groves Project. The Work shall consist of furnishing and installing all pipe, fittings, and appurtenances; all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping and restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Bonds required. Prevailing wages.

Goutam Dobey
 Login or create an account
 Login or create an account

Owner: City of Redlands CA

Published 05/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.