South Mission Beach Storm Drain and Green Infrastructure, San Diego, CA

San Diego County

Owner Reference: K-24-2115-DBB-3-A-C

Bid Date: 06/26/2024 at 02:00pm
37 Days until bid date

Pre-Bid: 05/30/2024 @ 10:00am

Estimate: $41,500,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Construction of South Mission Beach Storm Drain and Green Infrastructure consists of the installation of storm drain throughout various sections of South Mission Beach including Mission Boulevard, San Fernando Place, San Gabriel Place, Capistrano Place, Cohasset Court, and Balboa Court. Construction also consists of storm drain laterals through the alley sections along Mission Boulevard. The pipe size installation will range from 48 inches, 36 inches, 30 inches, 24 inches, and 18 inches. Installation of storm drain appurtenances, water quality basins, low flow diversion structures, slide gate, street resurfacing, curb ramps, landscape and irrigation, bike lane/striping and signage, and all other incidental work and appurtenances in accordance with these specifications. Bonds required. Prevailing wages.

Rosa Riego
 Login or create an account
 Login or create an account

Owner: City of San Diego CA

Published 05/08/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450