*New Bid Date* *Subcontractor Opportunities* Calle Real Water Loop Phase 2, Santa Barbara, CA

Santa Barbara County

Owner Reference: 19012-2

05/16/2024
Past bid date

Pre-Bid: 04/24/2024 @ 10:30am

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, C34 - Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

The construction of a new water line system to replace the old, antiquated water system for the County of Santa Barbara Calle Real Campus. Project new water line system with all appurtenances, such as valves, tees, crosses, meters, restraints, thrust blocks, etc., the necessary tie-ins to existing services to buildings. Contractor is to maintain water service and provide portable toilets as needed to assure continued service to each building with little to no interruption during construction. The Contractor will be required to coordinate all work with County Facilities/Maintenance to assure all occupants, staff and clients are duly notified of impending construction in the vicinity of their building. All shutdowns will be coordinated with and managed by County Facilities/Maintenance. Bonds required. Prevailing wages.

Darrell Goo
 Login or create an account
 Login or create an account

Owner: County of Santa Barbara CA

Published 05/02/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.