Schulz Information Center-Data Center UPS Replacement Project, Rohnert Park, CA

Sonoma County

Owner Reference: SSU-IFB-00000564-2024

Bid Date: 05/31/2024 at 02:00pm
12 Days until bid date

Pre-Bid: 05/17/2024 @ 10:30am

Trades: C10 - High Voltage Electrical Contractor (HVE): Power Lines, Street & Highway Lighting, Venues, Arenas, Utility, Transformers

Sonoma State University as developed the attached agency approved Contract Documents (drawings and specifications) to replace the existing failing 2006 Powerware UPS and associated batteries in Room 1076 of the Schulz Information Center building, also included in the scope of work is to refeed the existing boiler building from normal power ('DPH-MS') to emergency power ('EDPH-1'), as outlined in the agency approved Contract Documents (drawings and specifications). DVBE goal is 3%. Prevailing wages.

Ming-Lan (Joy) Sun
 Login or create an account
 Login or create an account

Owner: California State University Sonoma CSUS CA

Published 05/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450