Subcontractor Opps: Alternate Bikes Lanes, Marco Island, FL

Collier County

Owner Reference: 2024-016

Bid Date: 05/31/2024 at 02:00pm
17 Days until bid date

Pre-Bid: 04/25/2024 @ 10:00am

Trades: CG - *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310

This Project will provide In-Road Bike Lanes as an alternate route for bicycle traffic currently traveling either north or south along Collier Blvd, which is the most heavily traveled roadway on Marco Island and does not have a sufficient roadway to accommodate bicycle traffic or bicycle lanes. The Project will gain leverage from the bike lanes previously installed on Landmark (FPN #4308761. It will also provide important linkages to the two major east/west bike lanes currently on San Marco and Winterberry. The construction of alternate bike lanes in the North Segment: Amazon (Collier to Castaways), Castaways (Amazon to Saturn), Saturn (Castaways to Greenbrier),Greenbrier (Saturn to San Marco), and the South Segment: Peru, Winterberry to Seagrape), Seagrape (Peru to Swallow), Swallow (Collier to Collier). Bonds required. Prevailing wages.

Angela Johenning
 Login or create an account
 Login or create an account

Owner: City of Marco Island FL

Published 04/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.