Repair Utility Tunnel at ISU - Idaho State University, Pocatello, ID

Bannock County

Owner Reference: 21-654

Bid Date: 05/09/2024 at 02:00pm
7 Days until bid date

Pre-Bid: 04/16/2024 @ 11:00am

Estimate: $6,600,000

Trades: PWC - *General Engineering Contractor GEC; Subcontractor Opportunities

A description of the work of this project can be summarized to include Removal of 285 linear feet of craw tunnel and 327 linear feet of walkable tunnel. Install 435 linear feet of new walkable tunnel. Removal and replacement of the stairs/vault at the west entrance to the Administration Building. 1,342 linear feet of communications conduit bank, 1,654 linear feet of high voltage/communications conduit bank, 1,027 linear feet of high voltage conduit bank, along with pull boxes, vaults, and switch gear. Conduit banks to be installed by open trench or boring as per plans. Other improvements as per plans on the campus of Idaho State University, Pocatello, ID. Within the new tunnel system, the project will include: the replacement of the existing steam and condensate lines, update the ventilation system, add a sump pump, sidewalk & railing replacement, and make the connections of the new walking tunnel sections to the existing crawl and walking tunnel systems.

Lisa Makin, Project Coordinator
 Login or create an account

Owner: State of Idaho Department of Public Works (IDDPW) ID

Published 03/28/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.