ID 705229
Clark County
Owner Reference: CL-2024-091
Bid Date: 05/21/2024 at 02:00pm
14 Days until bid date
Pre-Bid: 04/30/2024 @ 10:00am
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
This project entails construction of an underground power conduit ductbank for Harry Reid International Airport. The ductbank extends from Harry Reid International Airport at Central Plant 1 to an existing NV Energy substation located at Russell Road and Annie Oakley Drive. The approximate length of the underground ductbank is 4 miles and is located within public right-of-ways, easements, and the private Airport roadway system. This project also includes construction of a turn lane beneath the Paradise Road bridge at the intersection with Flight Path Avenue. Bonds required. Prevailing wages.
Brandon Ledesma
Login or create an account
Login or create an account
Owner: Clark County Department of Aviation NV
Published 04/25/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450