2024-2025 Slurry Seal for Selected Streets, Washoe County, NV

Washoe County

Owner Reference: 2024-2025

Bid Date: 05/22/2024 at 02:00pm
3 Days until bid date

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Construction includes placement of approximately twenty-one (21) center-lane miles of varying widths of chip and type III micro seal in the Truckee Meadows, Incline Village, and surrounding areas. Additional work includes a 1.5" asphaltic concrete overlay on highway CR34 north of Gerlach. Miscellaneous work includes pavement markings, asphalt patching , and cracking filling. Bonds required. Prevailing wages.

Stephen Hein
 Login or create an account
 Login or create an account

Owner: County of Washoe NV

Published 05/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450