FY2024 Playground Surface Repairs , Reno, NV

Washoe County

Owner Reference: H100123

05/16/2024
Past bid date

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

In general, the major work items include: Repair existing EPDM layer at two playground sites (Mira Loma Park and Comstock Park). The existing wear course and 1-inch of the buffing course at these parks shall be completely removed and disposed, and repair or fill voids in buffing material to level surface area. A new 1/2-inch aliphatic wear course and 1-inch buffing course shall be installed per the manufacturer's recommendations. Bid alternates for repairing existing splash pads at Silver Lake Park and Las Brisas Park are also included. Includes any other miscellaneous work as required to meet ASTM standards for playground safety surfaces. Bonds required. Prevailing wages.

Sean Rahe
 Login or create an account
 Login or create an account

Owner: City of Reno NV

Published 05/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450