Collective Storm Drainage Improvement Project T, Charlotte NC

Mecklenburg County

Owner Reference: FY24-ITBCON-22

Bid Date: 05/30/2024 at 02:00pm
24 Days until bid date

Pre-Bid: 05/09/2024 @ 02:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Collective Storm Drainage Improvement Project (SDIP) Series T contains five separate storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures (standard and non-standard), storm drainpipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), foundation protection and any other associated work required by the Engineer. Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties Bonds required.

Bridgette Maxie (via email)
 Login or create an account
 Login or create an account

Owner: City of Charlotte NC

Published 04/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.