Public Works Stormwater Pipe Improvement Phase 2, Greenville NC

Pitt County

05/10/2024
Past bid date

Pre-Bid: 04/24/2024 @ 01:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The Public Works Stormwater Pipe Improvements Phase 2 project includes rerouting, replacing, and upsizing the existing storm drainage system from approximately 1,300 feet upstream of Beatty Street to the existing upstream headwall on Skinner Street with an 8’X8’ RCBC within the general area of the City of Greenville Public Works Yard. Traffic control and erosion control are also included within the scope of this project Bonds required.

Marc T Horstman
 Login or create an account
 Login or create an account

Owner: City of Greenville NC

Published 04/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.