2025 SMP Package IV (Bell Drive), San Antonio, TX

Bexar County

Owner Reference: CO-00727-RL

04/05/2024
Past bid date

Pre-Bid: 03/25/2024 @ 01:30pm

Estimate: $2,550,000.00

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera

The construction of approximately 6,430 LF of 6 to 12-inch PVC C-900, 432 LF of 2-inch HDPE DR 9 water mains, and 599 LF of 8-inch sanitary sewer mains via open-cut construction with a construction duration of 240 calendar days. Good Faith Effort. Bonds required. Prevailing wages.

Roxanne Lockhart
 Login or create an account
 Login or create an account

Owner: San Antonio Water System (SAWS) TX

Published 03/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450