ID 703431
Brazoria County
Owner Reference: PFT23201-2
04/30/2024
Past bid date
Pre-Bid: 04/16/2024 @ 10:00am
Estimate: $9.3 - $9.6 million
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, High Voltage Electrical Contractor (HVE): Power Lines, Street & Highway Lighting, Venues, Arenas, Utility, Transformers, Pavement Marking, Striping, & Reflectors - General Engineering Contractor
The proposed Project is composed of the new Rider 37 Roadways in Port Freeport. This is essentially a Reconstruction of 8th Street, Terminal Street, and Poplar Street; along with the new construction of a Jug-Handle Ramp connecting 2nd Street to Pine Street / FM 1495. The Work Includes Curb & Gutter Concrete Roadway, Drainage, Roadway Lighting, Signing and Pavement Markings. Bonds required. Prevailing wages.
Construction Services, c/o Freese & Nichols
Login or create an account
Login or create an account
Owner: Port Freeport TX
Published 04/10/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.