Detention and Drainage Facilities to serve Evergreen Phase 2 and 3, Houston, TX

Fort Bend County

Owner Reference: 1931-9030

Bid Date: 05/02/2024 at 11:00am
0 Days until bid date

Pre-Bid: 04/25/2024 @ 11:00am

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal

Construction of the Detention and Drainage Facilities to serve Evergreen Phase 2 and 3. Bonds required. Prevailing wages.

Clayton Weishuhn, P.E.
 Login or create an account

Owner: Fort Bend County MUD232 Municipal Utility District TX

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.