Construction of Cypress Green Mason Basin Excavation, Houston, TX

Harris County

Owner Reference: 16859-0037-01

Bid Date: 05/07/2024 at 09:00am
1 Days until bid date

Pre-Bid: 04/24/2024 @ 03:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Rock Slope Construction Mitigation & Stabilization - General Engineering Contractor

Scope of Work to construct Cypress Green Mason Basin Excavation. Includes excavation of Mason Basin and installation of rip rap and slope protection. Bonds required. Prevailing wages.

Tyler Green
 Login or create an account
 Login or create an account

Owner: Harris County MUD547 Municipal Utility District TX

Published 04/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.