2nd & 3rd Street Bike Infrastructure Phase 2, Richmond, VA

Richmond City County

Owner Reference: 118804

Bid Date: 05/30/2024 at 02:00pm
23 Days until bid date

Pre-Bid: 05/08/2024 @ 02:00pm

Trades: Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, *General Engineering Contractor GEC; Subcontractor Opportunities

The City of Richmond is accepting bids for the construction of 2nd / 3rd Street Bike Infrastructure, Phase 2 (UPC 118804) to provide general contracting services that include but are not limited to converting existing on-street parking into a two-way cycle track that is protected by a buffer and parked vehicles on 3rd Street from Franklin Street to Byrd Street. Bike improvement along 2nd Street starts at Spring Street to Byrd Street. In addition, the project includes bike improvement on Byrd Street from west of 2nd Street to east of 3rd Street. Bonds required. Prevailing wages.

Ross Crawford
 Login or create an account
 Login or create an account

Owner: City & County of Richmond VA

Published 04/26/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.