ID 705957
Benton County
Owner Reference: XE3542
Bid Date: 05/30/2024 at 11:99am
11 Days until bid date
Estimate: $5.0M - $6.0M
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
Excavation of the existing roadway, preparing the subgrade for existing and new lanes, placing base course, paving hot mix asphalt (HMA), installing a noise wall along the south portion of SR 240 (MP 28.14 to MP 28.77) along the Moon River RV Resort, provide delineation, update traffic signals, pedestrian crossings, illumination and signs, due to complexities of traffic control of this area of work, a detour will be utilized, which requires overlaying with HMA of Kingsgate Way and repairing pavement as needed for Battelle Drive and Stevens Drive and other work. Involves 82 items and 105 working days. Work class 4. A state funded project. Contains a 5% condition of award Small Business Enterprise goal and a 2% condition of award Veteran Owned Business goal. Bonds required. Prevailing wages.
Alejandro Sanguino
Login or create an account
Login or create an account
Owner: State of Washington Department of Transportation (WSDOT) WA
Published 04/30/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.