Eagle Creek Culvert Replacement Project, Wenatchee, WA

Chelan County

04/15/2024
Past bid date

Pre-Bid: 03/07/2024 @ 11:00am

Estimate: $1,085,000 - $1,325,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

This contract provides for the removal of four fish passage barrier culverts on Eagle Creek and the installation of four 3-sided pre-cast buried concrete box culverts between river-mile (RM) 0.4 and 0.6 on Eagle Creek. This work includes, but is not limited to installation, maintenance and restoration of temporary construction access routes and staging areas; temporary and permanent utility relocation; temporary traffic control as needed to safely deliver, handle, and stage equipment and materials; structure, channel, and roadway excavation; in-water-work requiring site isolation, temporary diversion of streamflow, shoring and dewatering as necessary; temporary erosion and sediment control; design, procurement, and installation of the new crossing structures; streambed and bank restoration; construction surveying required to perform the aforementioned tasks; and all other work. All onsite work shall occur between the dates of September 9th and October 31st, 2024. Bonds required. Prevailing wages.

Hannah Pygott
 Login or create an account
 Login or create an account

Owner: County of Chelan WA

Published 02/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.