ID 702799
Chelan County
04/22/2024
Past bid date
Estimate: $4.0M
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
Project involves a new stormwater conveyance system through Morris Street and Princeton Avenue before reconnecting to the existing storm system within Ninth St stormwater flows from Ninth St and the Wenatchee Valley College will be detained by an R-Tank subsurface detention modular system and then treated with StormFilter media cartridges. The existing open channel of No 2 Canyon drain will be rerouted through a piped system via Ringold St and Seventh St. Bonds required. Prevailing wages.
Purchasing
Login or create an account
Owner: City of Wenatchee WA
Published 04/04/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.