Unit Price Curb Ramps & Sidewalk Contract 3, Seattle, WA

King County

Owner Reference: 2024-020T

Bid Date: 05/15/2024 at 02:00pm
8 Days until bid date

Estimate: NTE $4.0M

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

This project consists of performing improvements to ADA curb ramps and associated curbs and sidewalks. Typical work to include traffic control, survey, surface removal, sawcutting, excavation, subgrade preparation, forming, placing and finish concrete work, detectable warning plates, Pedestrian Pushbutton Assembly installation, drainage and utility rework, HMA paving and roadway cement concrete, channelization, landscaping, installation of speed humps, and traffic sign installation or relocation. A Roadway type of project with a Past Performance of 21 Percent WMBE utilization rates based on completed projects. The Contract duration is for a period of 1 year with the option to extend to a 2nd year starting from the date of the first NTP Bonds required.

Abner Gallardo
 Login or create an account
 Login or create an account

Owner: City of Seattle WA

Published 04/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450