2023 Water Main Replacement, Bellevue, WA

King County

Owner Reference: 24047

Bid Date: 05/09/2024 at 11:00am
2 Days until bid date

Estimate: $8,760,000 - $10,700,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Work contemplated to be performed under this contract is as follows: • Constructing approximately 13,900 LF of ductile iron water mains, • Constructing approximately 1,300 LF of earthquake resistant ductile iron pipe water mains, • Constructing approximately 1,100 LF of HDPE water mains, • Installing new fire hydrant assemblies, • Installing replacement water services, • Constructing a replacement Pressure Reducing Station in a concrete vault, • Rehabilitate existing Pressure Reducing Station, • Construction dewatering, • Relocating existing utilities (as required), • Abandoning asbestos cement pipe, • Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, • Performing traffic control, • Other work as required to complete the project. Bonds required. Prevailing wages.

Paige Young
 Login or create an account
 Login or create an account

Owner: City of Bellevue WA

Published 04/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.