Well 2 and 3 Water Treatment Facility, Snoqualmie Pass, WA

Kittitas County

Owner Reference: HLA Project No. 22178A

05/02/2024
Past bid date

Trades: *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

Construction of a 32 ft x 40 ft CMU block water treatment facility building for Well 2 & 3, complete with process piping, chemical feed equipment, instrumentation, HVAC, lighting electrical, and control systems, installation of owner-furnished arsenic, iron, and manganese filtration equipment, installation of owner-furnished portable standby generator, site watermain piping, site electrical and power service, site grading and drainage, concrete sidewalks, and HMA surfacing. Bonds required. Prevailing wages.

Dean P, Smith
 Login or create an account
 Login or create an account

Owner: Snoqualmie Pass Utility District WA

Published 04/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450