SR 20, Pavng S Fork Mill Creek Rd to Tiger, Pend Oreille & Stevens Cos, WA

Pend Oreille County

Owner Reference: XE3535, FA Proj No 0020(213)

Bid Date: 05/08/2024 at 11:00am
8 Days until bid date

Trades: Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

Planing bituminous pavement, paving with HMA, rumble strips, erosion control, guardrail, guide posts, pavement markings, traffic control, roadway surveying, traffic control and other work. Involves 47 items. Work class 4. 17% DBE goal, 15% apprentice utilization requirement. Bonds required. Prevailing wages.

Pete Corley
 Login or create an account
 Login or create an account

Owner: State of Washington Department of Transportation (WSDOT) WA

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450