Rock Creek Bridge Replacement, Stevenson, WA

Skamania County

Owner Reference: 24-E10

04/26/2024
Past bid date

Pre-Bid: 04/12/2024 @ 10:00am

Estimate: $1,649,373

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The project consists of, but is not limited to, providing all materials, labor and equipment necessary to remove the existing 118' Glulam bridge, remove the existing mid-span pier, modifications to existing abutments and wingwalls, acquisition and installation of new substructures including piling and pile caps, structural excavation and backfill, acquisition and installation of a new 18'8"x 150' spliced, weathering steel bridge, acquisition and installation of erosion and sediment control measures, as well as associated bridge approach work. In addition, the project consists of, but not limited to, providing all materials, labor and equipment necessary to install and construct two geosynthetic reinforced Concrete Block Walls. Bonds required. Prevailing wages.

Gemma Baro-Montes
 Login or create an account

Owner: State of Washington Department of Natural Resources (DNR) WA

Published 03/26/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.