Stadium Way Crosswalk Improvements, Pullman, WA

Whitman County

Owner Reference: 2001-2023

04/03/2024
Past bid date

Pre-Bid: 03/21/2024 @ 10:30am

Estimate: $275,000 – $325,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Install two new crosswalks and signage on Stadium Way near the intersection with College Avenue and near Gannon Hall on the Pullman Campus of Washington State University. Work includes new ADA ramps with tunnel lid modifications, new solar-powered flashing lights and MUTCD signs, and crosswalk striping. At existing crossings, signage and street markings will be removed, two ADA ramps will be filled in and a stair will be removedAlternate 1: Replace existing crosswalk signage with new MUTCD standard signage, including solar-powered flashing beacons and stop bar as shown in C2.6 Alternate 2: Install new traffic island curb, pavement and crosswalk striping as shown in C2.6 enlargement to facilitate pedestrian crossing. Alternate 3: Replace existing crosswalk signage with new MUTCD standard signage, including solar-powered flashing beacons and stop bar as shown in C2.7. Alternate 4: Install new ADA ramps in existing sidewalk at both sides of crosswalk as shown in C2.7. Work to be done at Stadium Way between Main St and College Ave, Pullman, WA. Bonds required. Prevailing wages.

Cynthia Arbour
 Login or create an account
 Login or create an account

Owner: University of Washington State / Washington State University (WSU) WA

Published 03/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.