ID 704835
Whitman County
Bid Date: 05/21/2024 at 02:00pm
8 Days until bid date
Pre-Bid: 05/07/2024 @ 10:00am
Estimate: $350,000 – $400,000
Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's
This project at the Electrical Mechanical Engineering Building will add additional cooling capacity and a UPS system to server room 106 per the approved construction drawings. Construction and demolition will take place in server room 106 and the ground level mechanical room 003A, with a new cooling unit to be placed on the roof of the building. General scope includes removing and reconfiguring existing duct work, installing new duct work to create a hot and cold isle, installing a new DX “ACU-3/CU-3” cooling system, removing an existing power conditioner, and installing owner supplied UPS system per construction drawings. On-site work scheduling must be coordinated with the WSU Construction Manager and IT Systems and Services staff. Bonds required. Prevailing wages.
Rick Hull, Jr
Login or create an account
Login or create an account
Owner: University of Washington State / Washington State University (WSU) WA
Published 04/23/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.