An Equal Opportunity Employer is requesting quotations from all qualified DBE, MBE, WBE sub-contractors and/or material suppliers for the following project:

Reference
7395
Project
MWRA Deer Island Treatment Plant Clarifier Rehabilitation, Phase II
Location
Deer Island Treatment Plant, Winthrop, MA
Owner
Massachusetts Water Resources Authority
Bid Date
01/11/2023 at 02:00 PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

The work includes, but is not limited to replacement/repair of: the influent, effluent and dewatering gates, channel aeration piping system, concrete tank walls and ceilings, clarifier chain drive systems, Primary Effluent Cross Channel gate actuators, Return Sludge Vent Overflow piping; Primary Clarifier intermediate level hatches, headshafts and bearings, Primary Influent Channel Linabond; and the installation of new 480V service receptacles. FILED SUB-BIDS will be required for the following scopes: Miscellaneous and Ornamental Iron; Waterproofing, dampproofing, and Caulking; Painting; and Electrical. Filed Sub-Bids are due directly to the MWRA by 11:30 AM, November 30, 2022 via the MWRA Supplier Portal (https://supplier.mwra.com). MWDBE Participation Goals: 4.2% D/MBE & 4.5% D/WBE

Bid Documents

Bid documents can be viewed at or obtained from:

https://securecc.smartinsight.co/#/PublicBidProject/674120

Contact

Walsh Construction Company II LLC

100 River Ridge Dr, Suite 103
Norwood, MA 02062

Published 10/31/2022 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208