Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18528 Archived

FBD Vanguard Construction, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
WAM010 (Federal: HSIP5479(063)) and WTR059 (Federal: HSIP5479(062))
Project
Pedestrian Crossing Upgrades at 4 Locations and Guardrail Replacement at 4 Locations, Elk Grove, CA
Location
Elk Grove CA
Owner
City of Elk Grove CA
Bid Date
09/06/2023 at 10:00am

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Mobilization, Temporary Traffic Control, Construction Staking, Prepare Water Pollution Control Program, Clearing and Grubbing,  Remove Tree, Remove Bollard, Remove Pavement Marking, Roadway Excavation, Remove Curb, Remove Curb and Gutter, Remove Sidewalk, Remove Bike Path, Aggregate Base (Class II) ,Hot Mix Asphalt (Type A), HMA Bike Path (Type A), Minor Concrete (Curb Ramp), Minor Concrete (Type 1 Rolled Curb And Gutter), Minor Concrete (Type 2 Curb And Gutter), Minor Concrete (Type 3 Curb), Minor Concrete (Sidewalk), Hardscape Stamped Concrete, Knock-Down Bollard, Thermoplastic Pavement Marking, Paint Curb (Red), Paint Curb (Yellow), Roadside Sign And Post (Remove), Roadside Sign and Post (Install), Install Slotted Channel Drain, Adjust Water Valve Cover To Grade, Rectangular Rapid Flashing Beacon (RRFB) Assembly, Remove Guardrail, Minor Concrete (Vegetation Control), Install Midwest Guardrail System (Wood Post), Install Midwest Guardrail System (Existing Metal Post), Install Midwest Guardrail Transition Railing (Type Wb-31), Install MBGR To MGS Transition, Concrete Barrier Type 60Mc-Modified, End Treatment Tl-2, End Treatment Tl-3, End Anchor Assembly (Type SFT-M), Minor Concrete (Type 2 Curb and Gutter), Minor Concrete (Sidewalk), HMA Ramp Transition To Sidewalk, Adjust Street Light Pull Box Cover To Grade, Relocate Sign and Post

A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at following link: https://pbsystem.planetbids.com/portal/46142/bo/bo-detail/108326#bidDocs . FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Bid Documents

Bid documents can be viewed at or obtained from:

Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the following link: https://pbsystem.planetbids.com/portal/46142/bo/bo-detail/108326#bidDocs

Contact

FBD Vanguard Construction, Inc.

550 Greenville Road
Livermore, CA 94550

Published 8/25/2023 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208