Connector Rd Reconstruction and Sewer Extension , Tucson, AZ
- Owner Reference
- 20120331
- Bid Date
- Jul 2, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 6/16/2026 @ 09:00am @ (for location please or )
- Owner
- Tucson Airport Authority (TUS), AZ
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The scope of work for project 20112331 consists of the reconstruction of Connector Road with a proposed pavement section of 4-inches of asphalt, 4-inches of aggregate base course with stabilized subgrade. Asphalt mill and overlay of parking lot area adjacent to the Ryan Airfield Administration building and restaurant. Install new sewer line infrastructure and new fire access gate to include construction of gate pavements, conduit installation, updated fencing, gate loops, and electronic gate operators.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
Plans & Specifications
or to view plans and specification details.
CBS ID: 828613 | Published 6/11/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208