Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826193 Posted 5/27/2026

Bobby Harper Tunnel Pavement Friction Improvements (S), Winslow, AR

Owner Reference
A40056
Bid Date
Jun 24, 2026 at 01:30pm
Owner
State of Arkansas Department of Transportation (ARDOT), AR
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Description: The purpose of this Project is to Overlay with Silane Protective Surface treatment on approximately 0.30 mile of Interstate 49 in Washington County. This Project consists of Joint Rehabilitation, Maintenance of Traffic, Pavement Marking, Silane Protective Surface treatment, and Miscellaneous. items.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826193 | Published 5/27/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208