Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trial Segment 3), Fresno, CA
- Owner Reference
- 12601826
- Bid Date
- Jul 21, 2026 at 03:00pm
- Pre-Bid
- Scheduled, Optional - 7/8/2026 @ 10:00am @ (for location please or )
- Owner
- City of Fresno, CA
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, C27 - Water Supply & Irrigation Contractor: Landscaping Water Sprinkler System
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 120 working days
Description
The scope of work includes but is not limited to; installation of a 1.35-mile pedestrian and cycling trail along the Herndon Canal as part of a 7.1-mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along the Herndon Canal from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue and will ultimately connect four additional trail segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, installation of amenities such as benches, trail lighting, drinking fountains, bicycle racks, dog waste station, signage, striping, landscaping, and irrigation. Coordination with the City of Fresno, the Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 830112 | Published 6/23/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208