Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Fresno County, CA

#829146

Millerton Lake SRA Refuse Removal, Friant, CA

Description: Contractor shall furnish all labor, equipment, vehicles, and materials necessary to provide routine trash refuse removal services throughout Millerton Lake State Recreation Area including the North Shore located in Madera County and the South Shore located in Fresno County.
Post Date: 06/16/2026 Bid Date: 07/01/2026 Trades: Solid Waste Collection & Waste Management (Non-HAZ): Garbage, Trash Disposal, Recycling, Compacters, Balers NAICS-562111
#829155

Request for Proposals (RFP) for Professional Services - Kerman Public Safety Center, Kerman, CA

The objectives of this design commission include 1) Understanding the facility Needs of the Police Department; 2) Conduct thorough examination/analysis of the acquired buildings for remodel and retrofit; 3) Address site constraints and design and recommend site alterations for access and security; 4) Complete design package for remodel of buildings, with bid package and documents; and 5) Assist the City with contractor selection and construction management. The proposed Scope of Work (SOW) shall be based on an examination and understanding of the existing two-story structure and separate warehouse facilities at the proposed Kerman Public Safety Center located at 15061 West C Street (refer to Attachment A). Project tasks shall include, but are not necessarily limited to, the following. If the Proposer feels that additional tasks are warranted, they must be clearly identified in the Proposers submission

Post Date: 06/16/2026 Bid Date: 07/02/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#826616

Cedar-Shields-Fountain Intersection Enhancements, Fresno, CA

The scope of work includes but is not limited to; Installation of retroreflective backplates, advance stop bars, and leading pedestrian intervals at the intersection of Cedar and Shields. Installation of intersection lighting, highvisibility crosswalks, a pedestrian hybrid active crosswalk (HAWK), and reconstruction of curb returns at the intersection of Cedar and Fountain

Post Date: 05/31/2026 Bid Date: 07/07/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#829149

REBID - Shaw Ave Roadway Improvements Fruit Avenue to Palm Avenue , Fresno, CA

The scope of work includes but is not limited to; pavement rehabilitation of approximately 0.7 miles along Shaw Avenue, extending from Fruit Avenue to 950 east of Palm Avenue. The scope of work includes milling 0.3 feet of existing pavement surface and placing 0.34 feet of asphalt overlay. Additional improvements include reconstruction of curb ramps to meet ADA standards, adjustment of manholes and valve covers, new signage and striping, and traffic loop replacement
Post Date: 06/16/2026 Bid Date: 07/07/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
#828797

RFQ GAOA High Sierra Ranger Station Demolition, Sierra National Forest, Clovis, CA

Total Small Business Set-Aside, 238910 - Site Preparation Contractors. Work includes the removal and disposal of nine existing buildings, plumbing, concrete footings, and electrical conduit at the High Sierra Ranger Station. Pop 07/13/2026 to 09/30/2026.

Post Date: 06/12/2026 Bid Date: 07/08/2026 Trades: C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling
#826617

Senior Housing Demolition, Fresno, CA

The scope of work includes but is not limited to; Demolition of the existing building and parking lot at 4333 North Blackstone Avenue. Demolition activities include removing existing building structure, cutting and capping existing utilities (gas, fire, sewer), removing existing AC pavement and landscape islands, removing curbs, gutters, walkways, equipment slabs, and removing existing light poles, signs, and all trees and existing landscaping
Post Date: 05/31/2026 Bid Date: 07/14/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, D63 - Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#830725

Check Structure 17 Structural Modifications, San Luis Canal, Los Banos, CA

Project Summary: This Project will permanently remove the four Check 17 radial gates and retain one of them for storage. The Project includes the following principal features: Earthwork and other related work, including a. Soil scarification and excavation. b. Soil compaction. c. Placement of aggregate base. d. Construction of temporary access road. e. Site restoration to match existing conditions. Contaminated Site Material Removal: a. Removal, recovery, and disposal of hazardous substances, materials, and waste associated with the proposed structural modifications and Stoplogs Repair and Transportation: a. Replace stoplog rubber seals, including new steel plates and hardware. b. Transport stoplogs from Dos Amigos Pumping Plant and mobilize at Check Structure 17, for installation by Department personnel. c. Transport stoplogs from Check Structure 17 and return to Dos Amigos Pumping Plants storage area. Fabricate Radial Gate Cradle Frame. Dewatering of Check Structure 17 gate bays, Removal of all four existing radial gates and appurtenances at Check Structure 17. Dispose of radial gates No.1, 3, and 4, Radial gate No. 2 shall be transported to the Coalinga O&M Yard and stored on Contractor fabricated steel gate cradle frame, Fences and Gates: a. Reinstall barbed wire fence and swing gates.
Post Date: 06/28/2026 Bid Date: 07/15/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C13 - Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates
#830111

Furnish and Install New Pumping Equipment at Pump Station 002B, Fresno, CA

The scope of work includes furnishing and installing a new pump assembly including column pipe, line shaft, bearings, suction pipe, and foot valve

Post Date: 06/23/2026 Bid Date: 07/21/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), D21 - Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's)
#830112

Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trial Segment 3), Fresno, CA

The scope of work includes but is not limited to; installation of a 1.35-mile pedestrian and cycling trail along the Herndon Canal as part of a 7.1-mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along the Herndon Canal from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue and will ultimately connect four additional trail segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, installation of amenities such as benches, trail lighting, drinking fountains, bicycle racks, dog waste station, signage, striping, landscaping, and irrigation. Coordination with the City of Fresno, the Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required

Post Date: 06/23/2026 Bid Date: 07/21/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, C27 - Water Supply & Irrigation Contractor: Landscaping Water Sprinkler System
#831074

Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trial Segment 3) , Fresno, CA

The scope of work includes but is not limited to; installation of a 1.35-mile pedestrian and cycling trail along the Herndon Canal as part of a 7.1-mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along the Herndon Canal from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue and will ultimately connect four additional trail segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, installation of amenities such as benches, trail lighting, drinking fountains, bicycle racks, dog waste station, signage, striping, landscaping, and irrigation. Coordination with the City of Fresno, the Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required

Post Date: 06/30/2026 Bid Date: 07/21/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, C27 - Water Supply & Irrigation Contractor: Landscaping Water Sprinkler System
#831076

Furnish and Install New Pumping Equipment at Pump Station 002B , Fresno, CA

The scope of work includes furnishing and installing a new pump assembly including column pipe, line shaft, bearings, suction pipe, and foot valve

Post Date: 06/30/2026 Bid Date: 07/21/2026 Trades: C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#830204

NEW BID DATE - Request for Qualifications for Design/Build Services for Multi-Site Design and Construction, Fresno, CA

Request for Qualifications for Design/Build Services for Multi-Site Design and Construction

Post Date: 06/24/2026 Bid Date: 07/23/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
#830919

Request for Qualifications for Design/Build Services for Multi-Site Design and Construction, Fresno, CA

Scope of Work: Modernizations, demolitions, infrastructure improvements, and new construction across multiple sites, with individual site budgets ranging from $20M to $50M.

Post Date: 06/29/2026 Bid Date: 07/23/2026 Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
#830718

Shaw Avenue Widening - Phase 2, Clovis, CA

Street improvements on Shaw Avenue from DeWolf Avenue to Leonard Avenue include roadway widening and utility infrastructure improvements. Roadway widening improvements include, but are not limited to, demolition and removal of existing improvements; installation of asphalt pavement; concrete improvements including curb and gutter, medians, and related concrete features; street lighting; installation of an underpass structure and associated foundations; traffic striping, pavement markings, and signage; traffic signal installation and modifications; installation of traffic detection loops; and other miscellaneous improvements. Utility improvements include, but are not limited to, installation and/or relocation of fiber, electrical, storm drain, domestic water, recycled water, and sanitary sewer

Post Date: 06/28/2026 Bid Date: 07/28/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS), Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
#830360

FCC Chiller & Cooling Towers and CCC Chiller Modernization, Fresno, CA

Scope of work for this project will consist of the following: Replace chillers and cooling towers at the Fresno City College central Plant and modernization of chillers at Clovis Community College central plant

Post Date: 06/24/2026 Bid Date: 08/06/2026 Trades: C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
#830363

All-Weather Track & Synthetic Turf, First Responders Campus, Fresno, CA

Scope of work for this project will consist of the following: a) Overlay the existing asphalt track with an all-weather surface b) Extend the existing concrete obstacle course 5' north and 75' south with an all-weather surface c) Remove and replace the existing turf at the northern half of the inner track with synthetic turf d) Overlay the existing inner concrete track with an all-weather surface
Post Date: 06/24/2026 Bid Date: 08/06/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, D47 - Sports & Athletic Fields, Laser Grading, Artificial Turf Maintenance, Football, Baseball, Soccer, Track, Lacrosse, Ninja Courses
#830366

New Science Building Concrete Remediation, FCC, Fresno, CA

Remediate interior concrete flooring due to flaws including uneven surfaces, rough surface texture, uneven sheen, trowel marks/patterns, uneven color and steel trowel burning, boot prints, cracks, spalls, and pitting. The building will be occupied during construction and will require weeknight and weekend work to minimize disruption to students and staff

Post Date: 06/24/2026 Bid Date: 08/06/2026 Trades: C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Interior/Exterior Sports Athletic Facilities: Sports Courts, Paving, Concrete or Wood Flooring: Basketball, Racquetball, Tennis
#825240

FAX Maintenance Building Steam Bay Renovation, Fresno, CA

The scope of work for the FAX Steam Bay Renovation project will update a partially operable maintenance lift replacing it with a surface mounted lift as well as backfilling the existing lift and pit to make the bay working area a continuous surface, removing existing steps in the work area. The key items are as follows: Remove existing in-ground lift and upgrade to a surface mounted lift Remove unnecessary maintenance bay conduits and equipment Clean and repaint steam bay walls Re-route existing electrical and/or plumbing on the wall
Post Date: 05/21/2026 Bid Date: 06/02/2026 Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, D21 - Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's)
#825241

Cedar Ave at Fountain HAWK and Shields Traffic Signal Equipment, Fresno, CA

Cedar Ave at Fountain HAWK and Shields Traffic Signal Equipment

Post Date: 05/21/2026 Bid Date: 06/02/2026 Trades: Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS), Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment
#824618

Branding & Paint And Site Improvements To John K. Kennedy Middle School, Sanger, CA

Branding & Paint And Site Improvements To John K. Kennedy Middle School

Post Date: 05/18/2026 Bid Date: 06/03/2026 Trades: C33 - Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors