The City of Clovis is requesting proposals from qualified and experienced design firms to provide professional engineering services for the Surface Water Treatment Plant Clear Well Expansion Design project
Post Date: 05/21/2026Bid Date:06/12/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Total Small Business Set-Aside, 238110 - Poured Concrete Foundation and Structure Contractors. The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work
Post Date: 05/23/2026Bid Date:06/12/2026Trades: C15 - Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
Total Small Business Set-Aside, 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The scope of work for this requirement involves designing, furnishing, installing, and commissioning an operational vehicle exhaust source capture system compliant with all applicable Unified Facilities Criteria (UFC), Air National Guard Engineering Technical Letters (ANG ETL) and National Fire Protection Association (NFPA) standards. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work.
Post Date: 05/23/2026Bid Date:06/12/2026Trades: C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Scope of Work: The project consists of the Replacement of the Existing Stadium and Associated On-Site and Off-Site Work.
Post Date: 05/11/2026Bid Date:06/16/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic
The City of Fresno Department of Transportation/Fresno Area Express (hereinafter FAX) is soliciting proposals to provide janitorial services. The janitorial staffing and supplies will be needed to cover six (6) buildings, totaling approximately 21,000 interior square feet of various Fresno Area Express (FAX) and Fleet Maintenance buildings. Janitorial services will be required Monday through Sunday and for day and evening shifts; weekend and holiday services are limited. The request is for a three-year (3) contract with two (2) optional one (1) year extensions from the date of the Notice to Proceed
This contract is to provide labor and equipment to test 70kv circuit switchers, 15kv breakers, 15kv potential transformers, 15kv protective relays, 480v switchgear breakers, 480v MCC breakers/starters, Switchgear DC station batteries, and 15kv feeder cables. All Equipment and cables are to be tested to the latest NETA and NFPA 70B specifications and standards
Post Date: 05/21/2026Bid Date:06/16/2026Trades: C7 - Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
The scope of work includes: The Runway 12L-30R Rehabilitation Project consists of a mill and overlay rehabilitation of Runway 12L-30R with new asphaltic concrete pavement. Approximately 185 feet of the Runway 12L end will be reconstructed using new asphaltic concrete pavement. The project includes minor grading upgrades on the runway, and pavement markings
Post Date: 05/25/2026Bid Date:06/16/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
Total Small Business Set-Aside, 238910 - Site Preparation Contractors. Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAAs Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below: CZQ VOR Clovis, CA (38.884322, -119.815140). The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas.PoP June 24, 2026 - Sept 30, 2026.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling
The City of Coalinga is requesting Statements of Qualifications (SOQ) from qualified airport engineering consulting firms to provide professional design engineering services for the replacement of the Automated Weather Observing System (AWOS) at the New Coalinga Municipal Airport. Services may also include future airport engineering and design-related projects. The selected consultant will assist the City with FAA Airport Improvement Program (AIP) grant coordination, engineering design, preparation of plans and specifications, bid support, regulatory coordination, and related airport improvement services
Post Date: 06/01/2026Bid Date:06/22/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
The project involves 0.75-miles of street improvements on Herndon Avenue from Villa Avenue to Clovis Avenue including removing and replacing existing asphalt pavement, replacement of curb returns, adjustment of utility boxes, manholes and utility valve boxes to finished grade, replacement of traffic striping, markings, and signage, traffic signal modification, and reinstallation of traffic loops detectors
Post Date: 06/16/2026Bid Date:06/23/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi
In general, the project consists of the renovation of Rooms 256, 255 and 249, located in the McKee Fisk Building, from an existing photo lab into an anthropology lab. Contractor shall demolish existing photo lab doors, casework, plumbing and electrical fixtures, as well as electrical switches and outlets. Contractor shall install new architectural finishes, furniture, plumbing and electrical improvements
Post Date: 05/19/2026Bid Date:06/25/2026Trades: C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Mold Abatement & Remediation, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , C7 - Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, C33 - Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, C6 - Cabinetry & Millwork, Finish Carpentry Contractor, Casework, C15 - Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors