Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#819485 Posted 4/16/2026

NEW BID DATE: Phase 3B Liner Expansion Savage Canyon Landfill, Whittier, CA

Owner Reference
23-019
Bid Date
May 14, 2026 at 11:00am
Questions Due By
April 29, 2026 by 5:00pm
Pre-Bid
MANDATORY - 4/28/2026 @ 09:00am @ (for location please or )
Estimate
$5,412,000
Owner
City of Whittier
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion
Duration
110 Working Days

Description

The Work generally involves the construction of Phase 3B liner expansion at the Savage Canyon Landfill located in Whittier, California. The Work will consist of mass excavation; subgrade preparation; earthwork; installation of high density polyethylene (HDPE) geomembrane, geosynthetic clay liner (GCL), geocomposite, geotextiles; installation of HDPE, corrugated metal pipe (CMP) piping; construction of surface water control structures; and asphalt concrete paving, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Caltrans Standard Specifications, 2024 Edition and the Standard Specifications for Public Works Construction (The Greenbook), 2024 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 819485 | Published 4/16/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Updates

  • Posted 05/07/2026

    Bid date extended via addendum dated 05/05/26

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208