Fremont - Playground Turf Installation Infant Toddler Area, Montclair, CA
- Bid Date
- May 6, 2026 at 04:00pm
- Questions Due By
- May 5, 2026 by 4:00pm
- Estimate
- $85,000
- Owner
- Mexican American Opportunity Foundation
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
- Phase
- Contracted Services & Suppliers
Description
General Requirements: Contractor shall provide all labor, materials, equipment, tools, hauling, disposal, and incidentals required for a complete and safe installation. Site Preparation: Walk the entire outlined area and identify all trip hazards, depressions, uneven surfaces, and drainage issues. Remove existing surface materials as needed (grass, soil, debris, roots, rocks, etc.). Excavate and regrade the area to create a uniform, level, and safe play surface appropriate for infants and toddlers. Ensure the subgrade is compacted to a stable condition with no soft spots or voids. Base Installation: Install a compacted aggregate base (e.g., Class II road base or equivalent) to achieve proper leveling and drainage. Grade the base to eliminate dips, humps, or transitions that could create tripping hazards. Compact base to manufacturer recommended density. Safety Underlayment: Install a playground rated shock pad underlayment suitable for infant/toddler fall zones and compliant with applicable ASTM standards. Ensure underlayment is installed flush and without gaps, folds, or uneven seams. Turf Installation: Furnish and install playground grade synthetic turf designed for early childhood play environments. Roll out turf, align grain, and trim edges to fit the outlined area. Seam turf sections using manufacturer approved methods and adhesives. Secure turf perimeter to prevent lifting, curling, or displacement. Infill & Grooming: Apply manufacturer approved infill (if required) to achieve proper cushioning, stability, and performance. Groom turf to ensure even distribution and a uniform finished appearance. Final Cleanup & Turnover: Remove all construction debris, excess materials, and waste from the site. Perform a final walkthrough with MAOF representative to confirm: Surface is level and free of trip hazards, Turf is secure and properly installed, and Area is safe for infant/toddler use. Provide manufacturer warranties and maintenance recommendations. Contractor Responsibility Acknowledgment: By submitting a proposal, contractor acknowledges and accepts that: All measurements are estimates and must be independently verified. No additional documentation (plans, photos, drawings, or specifications) will be provided. Contractor is fully responsible for field verification, code compliance, permitting, and installation quality.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 820347 | Published 4/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208