Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825658 Posted 5/23/2026

Puente Hills Materials Recovery Facility Modification of the Stormwater Capture System, Whittier, CA

Bid Date
Jun 23, 2026 at 02:00pm
Pre-Bid
MANDATORY - 5/28/2026 @ 10:00am @ (for location please or )
Estimate
$525,000 - $875,000
Owner
Los Angeles County Sanitation District (LACSD), CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

This project will improve the performance of the existing stormwater capture system to minimize stormwater monitoring and sampling frequency. The project includes replacing and upsizing the existing 15 hp storm water pump to 25 hp submersible pump at Drainage Area 3, installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing 170 linear feet of 10-inch PVC pipe.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825658 | Published 5/23/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208