Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827242 Posted 6/3/2026

LOC 100 Flooring Demolition and Glue Down Installation, Montebello, CA

Bid Date
Jun 9, 2026 at 04:00pm
Questions Due By
June 5, 2026 by 4:00pm
Owner
Mexican American Opportunity Foundation, CA
Trades
C15 - Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
Phase
Renovation, Remodel, Improvements, Upgrades

Description

This Statement of Work outlines the scope of flooring demolition and replacement services to be performed at 401 N Garfield Ave, Montebello, CA 90640. The work includes the removal and replacement of existing laminate flooring, rubber base, and installation of transition strips in designated areas. Flooring Demolition Main Hallway: Remove and dispose of approximately 532 linear feet of existing 4-inch rubber base. Remove and dispose of approximately 3,325 square feet of existing laminate flooring. Conference Room: Remove and dispose of approximately 182 linear feet of existing 4-inch rubber base. Remove and dispose of approximately 1,650 square feet of existing laminate flooring. Demolition Notes: Contractor shall remove flooring materials with reasonable care to avoid damage to adjacent finishes and building components. All demolition debris shall be collected and removed from the site daily. Disposal of removed materials shall be in accordance with applicable local regulations. Flooring Installation Main Hallway Furnish and install approximately 3,325 square feet of laminate flooring. Furnish and install approximately 532 linear feet of 4-inch rubber base. Conference Room: Furnish and install approximately 1,650 square feet of laminate flooring. Furnish and install approximately 182 linear feet of 4-inch rubber base. Transition Strips: Furnish and install approximately 46 transition pieces, with one (1) transition piece installed at each doorway or flooring transition location. Installation Notes: Flooring shall be installed in accordance with the manufacturer's written specifications and industry's best practices. Rubber base shall be securely adhered and neatly finished at all corners, joints, and terminations. Transition strips shall be installed where flooring surfaces meet at doorways and other designated transition points.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827242 | Published 6/3/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208