Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825339 Posted 5/21/2026

2025 Arterial Rehabilitation including Bolsa Avenue (Bolsa Chica Street to Goldenwest Street), Huntington Beach, CA

Owner Reference
1771
Bid Date
May 28, 2026 at 10:00am
Questions Due By
May 21, 2026 by 10:00am
Estimate
$6,500,000
Owner
City of Huntington Beach, CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
The contract shall allow the Contractor 200 working days to complete the contract. Project NTP shall start no later than Monday, July 27, 2026.

Description

Schedule A: Bolsa Avenue Rehabilitation: The project segment for the Street Improvements is Bolsa Avenue from Bolsa Chica Street to Goldenwest Street. The street segment improvements consists primarily of cold milling of the existing pavement, deep lift removal of failed roadway sections, asphalt base paving, rubberized asphalt concrete (RAC) surface course paving, type II slurry, Full Depth Reclamation with Cement Stabilized Pulverized Base, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, pedestrian push buttons, cross gutters, driveway approaches, reconstructing local depression, tree replacements and landscaping, installing composite manholes and valves to grade, and installing traffic loops with striping and signage. Schedule B: Frankfort Avenue Storm Drain Improvement: The project area is at the intersection of Frankfort Avenue and White Sand Street. The storm drain improvements on Frankfort Avenue consists of the installation of new HDPE (High-Density Polyethylene) pipe; replacement of sidewalk, curb and gutter, and local depression; construction of new catch basin; HDPE to concrete catch basin connection; replacement of asphalt base and surface course; and cold mill of affected areas as noted on the plans. Schedule C: 10th Street Alley Improvement: The project segment for the 10th Street alley improvement is from Olive Avenue to Orange Avenue between 9th Street and 10th Street. Alley improvements consist of; adjustments to water meters, water valves, manholes, and other utilities; installation of redwood headers; and pavement grind and overlay. Schedule D: Downtown Alley Improvements: The project segment for the 9th Street alley improvement is from Walnut Avenue to Olive Avenue between 8th Street and 9th Street. The project segment for the 11th Street alley improvement is from Orange Avenue to Pecan Avenue between 10th Street and 11th Street. The project segment for the 10th Street alley improvement is from Orange Avenue to Pecan Avenue and Walnut Avenue to Olive Avenue between 9th Street and 10th Street. Alley improvements consist of; adjustments to water meters, water valves, manholes, and other utilities; installation of redwood headers; and pavement grind and overlay.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825339 | Published 5/21/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208