SFPUC Upcoming Contracting Opportunity: Design/Build the Transmission Line Clearance Mitigation Moderate and Low Risk, San Francisco, CA
Owner Reference
DB-139R
Bid Date
Dec 31, 2026 at 02:00pm
Estimate
$55,000,000 - $60,000,000
Owner
San Francisco Water Power Sewer (SFWPS)
Trades
*A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Phase
Contracted Services & Suppliers
Description
The SFPUC is a Department of the City and County of San Francisco (“City”) that supplies drinking water to 2.7 million customers in the four Bay Area counties of Alameda, Santa Clara, San Mateo, and San Francisco, and upcountry near Groveland in Tuolumne County, and provides sewer services to San Francisco residents, hydroelectric power to San Francisco’s municipal operations, and clean, renewable power to San Francisco customers. The SFPUC manages over 160 miles (320 circuit miles) of high voltage transmission lines. The SFPUC transmission lines begin at power generation facilities at the Early Intake Switchyard in Tuolumne County and end at Newark Substation in Alameda County. Due to the unique complexities of the design and construction required for this Project, the City has determined that the Project requires specialized expertise and skills, which should be procured using an alternate project delivery method in comparison to the traditional design-bid-build. The City has selected a progressive design-build project delivery method in accordance with San Francisco Administrative Code section 6.61, subdivision (c). The Design-Builder will be obligated to collaborate with the SFPUC on defining and procuring multiple trade subcontracts for efficient and timely project delivery. Project Objectives The objective of the project is to perform clearance mitigations to spans of existing SFPUC owned and operated 115kV and 230kV overhead power transmission lines. SFPUC has identified a possible one-hundred and fifteen (115) moderate and low risk clearance detections and three (3) additional risk clearance sites. The existing subject circuits have been identified by the SFPUC as being non compliant with California General Order 95 (GO 95) and the National Electrical Safety Code (NESC). The Design-Builder will be required to perform mitigation measures for these identified spans to bring them into compliance with NESC and G095 standards and design criteria. Work may include site grading, increased conductor tensions, installation of floating dead-end suspension assemblies, tower structure raises, tower replacement, intermediate mid-span tower structures, or one or more combinations of the methods, or implementation of other solutions.
Contact
or
to view contact name.
or
to view phone number.
or
to view email address.
Plans & Specifications
or
to view plans and specification details.
CBS ID: 804063 | Published 1/14/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208