Browse all San Francisco County, CA
SFMTA Garage Elevator Modernization - Phase 2A, San Francisco, CA
Scope of Work: This project involves the modernization of three traction passenger elevator and one hydraulic elevator at Ellis OFarrell Garage (EOF) located at 123 OFarrell Street and the modernization of two traction passenger elevators located at St. Mary's Garage (SMA) located at 433 Kearny Street in San Francisco. The modernization involves the replacement and refurbishment of existing elevator equipment, controllers, fixtures, elevator cabs and includes related mechanical, electrical, and fire protection work
Gene Friend Recreation Center Project (a CM/GC Project) Trade Package, San Francisco, CA
Various Locations Pavement Renovation No. 89 and Sewer Replacement, San Francisco, CA
Scope of Work: at various locations in Districts 9 & 11 of San Francisco, California and consists of street resurfacing, curb ramp construction, sewer replacement, traffic control, and all related work
04-0W1404 Replace bridge fender system and skirt modification, San Francisco, CA
General work description: Replace bridge fender system and skirt modification.
SFPUC Upcoming Contracting Opportunity: Design/Build the Transmission Line Clearance Mitigation Moderate and Low Risk, San Francisco, CA
Fire - Special Services Administration, San Francisco, CA
HVAC Master Agreement, San Francisco, CA
FMD Fire Sprinkler System, San Francisco, CA
Project Description: Fire sprinkler system maintenance and repair services being offered by the Department of General Services, Facilities Management Division (FMD).
04-2X7604 Cold Plane AC Pvmt., & RHMA (Gap Graded)(Bonded Wearing Course), San Francisco, CA
General work description: Cold plane AC Pvmt., & RHMA (gap graded) (bonded wearing course).
Annual Carpet and VCT Cleaning Services for EDD Facility, San Francisco, CA
Description: Annual Carpet and VCT (Vinyl Composite Tile) Cleaning Services for the EDD facility located at 745 Franklin Street, San Francisco, CA 94102.
Prequalification - Design-Build Civil and Tunnel Construction (40-CT) for the Transbay Portal, San Francisco CA
Design-Build Civil and Tunnel Construction (40-CT) for the Transbay Portal (Project) to the shortlisted firms selected through 23-04 Request for Qualifications (RFQ) Progressive Design-Build Civil and Tunnel (Proposers). The RFP documents and related information has been emailed to the shortlisted firms on Friday, December 19, 2025. Qualificatio Interviews 2/2/26 - 2/13/26. Notification of Highest-Scoring Proposer Aug 7 2026.
NEW BID DATE - Crystal Springs Pipeline No. 2 Reach 5 Lining Replacement, San Francisco, CA
Crystal Springs Pipeline No. 2 Reach 5 Lining Replacement
Ferry Operations, Maintenance, and Repair Services, San Francisco, CA
WETA, a local agency with multi-county jurisdiction, was established by the California Legislature to expand regional ferry service and coordinate waterborne emergency response activities on San Francisco Bay. WETAs vision is to develop, operate and manage an expanded and enhanced region-wide ferry system that provides a reliable, state-of-the-art and attractive transportation option for the Bay Area, and to play a critical role in coordinating and providing water transportation to serve emergency response and economic recovery needs.
Moccasin Dam and Reservoir Long-Term Improvements, San Francisco, CA
The Project is an integral part of the Hetch Hetchy Water and Power water supply system (Hetch Hetchy system). The main purpose of the Hetch Hetchy system is to convey raw drinking water from Hetch Hetchy Reservoir to the San Francisco Bay Area. This conveyance is achieved through a combination of reservoirs, pipelines, and tunnels. Moccasin Reservoir is located directly downstream of the last of the three powerhouses of the Hetch Hetchy system, directly over Moccasin Creek. On March 22, 2018, a severe storm caused a flood surge and damaged various infrastructure. The Project includes modifying the approach upstream of the ogee-crested weir, enlarging/modifying the ogee-crested weir, new concrete bridge, new concrete spillway chute, enlarged stilling basin, and other work as detailed in this RFQ&P.