Construction Stormwater Inspection Services, Santa Maria, CA
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform the Construction Stormwater Inspection Services.
Need an account?
Remembered your password?
Already have an account?
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform the Construction Stormwater Inspection Services.
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform On-Call Landscape Architecture and Site Design Professional Services.
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform the On-Call Civil Engineering and Surveying Professional Services.
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform On-Call Geotechnical Engineering and Materials Testing Services.
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to perform the On-Call Construction Management and Inspection Services.
In general, the work consists of, but is not limited to, grinding 3 inches of the existing road surface and paving with 4 inches. The project will also include restriping the road and adjusting to grade any valves or manholes that are in the roadway.
County of Santa Barbara is inviting bids for the labor, materials, tools, and equipment necessary to complete the Ortega Hill - N. Jameson Bike Connection in the 1st Supervisorial District.
The City of Santa Barbara is inviting proposals from qualified construction management firms to provide pre-construction phase support and construction phase management and inspection services for the Vic Trace Reservoir Replacement Project (project). The Project will replace a 10 million-gallon drinking water storage tank to improve operational flexibility and maintain critical drinking water storage for the community. Various nearby critical pieces of aging infrastructure that support the functionality of the water distribution system (e.g., pipelines, valves, pressure reducing stations, pump stations, etc.) will also be replaced.
Total Small Business Set-Aside, 238990 - All Other Specialty Trade Contractors. The purpose and intent of this solicitation is for, but not limited to, removal and disposal of the existing fire station mobile home-style barracks and replace it with a new wildland urban interface (WUI) rated, barracks-style mobile home. Performance shall include all necessary details to connect utilities for a habitable structure.
Total Small Business Set-Aside, 238910 - Site Preparation Contractors. The Contractor shall furnish all parts, labor material, equipment, transportation and supervision necessary to demolish vacant Building 13140 Thor Dormitory including slabs, adjacent sidewalks, interior floors, walls, ceilings, exterior walls, roof, interior and exterior doors, windows and all existing equipment (e.g. mechanical, communications, electrical systems) and any furnishings within the building. All equipment supporting B13140 shall be removed from B13143 Mechanical Support Building. Facilities shall be inspected and, if found, all Asbestos Containing Materials (ACM) or lead-based paint (LBP) within or on B13140 and B13143, at Vandenberg SFB, CA, shall be removed and properly disposed of.
The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to complete the Active Transportation Program (ATP) Cycle 7 Railroad Avenue/Depot Street Corridor Improvements.
This Scope of Work outlines the roles, responsibilities, and deliverables for providing Campus Security Personnel Services for SMBSDs four (4) Junior High Schools.
Contractor shall provide all labor, materials, equipment, tools, transportation, insurance, and services to clear and grub areas to be graded; install erosion control prevention; construct new trail; grade new drainage swale; underground section of ex. water line; grading and site preparation for University planting; and provide irrigation connections, as described in the Construction Documents.
General project work description: The Project generally consists of the removal and reconstruction of an existing concrete-lined channel, earthwork excavation and grading for a new access ramp, and associated work. The Project also includes water pollution control measures, temporary water diversion, and all related work necessary to complete the improvements. General project location: The project is located along Bradley Channel between Jones Street and Main Street within the City of Santa Maria.
The City seeks to remove two existing gas-fired rooftop HVAC units, and replace with two new electric heat pumps and economizers; curb replacement; limited ductwork replacement; roof repairs and flashing installation; installation of a new support glulam beneath RTU 17; and required electrical upgrades and controls installation. The new HVAC units will be placed in roughly the same openings after curb replacement. System start-up, testing, and balancing are required.