Browse all Shasta County, CA
Road Rocking Services for Miller Demonstration State Forest, Whitmore, CA
Replace AC Surfacing 2026, Redding, CA
02-2K0004 Bridge Replacement and Roadway Widening, Shasta, CA
General work description: Bridge replacement and roadway widening.
Brush Chipper, Redding, CA
Stillwater Wastewater Treatment Plant Secondary Clarifiers 1 and 2 Rehabilitation, Redding, CA
The project will rehabilitate existing secondary clarifiers 1 and 2 at the City's Stillwater Wastewater Treatment Plant by removing and replacing all mechanical and electrical equipment inside the clarifier structures, as well as the access bridges and stairs, the grout floors, effluent slide gates, and all piping inside both structures
On-Call Electric Utility Excavation and Associated Work, Redding, CA
Sacramento River Trail Overlook, Redding, CA
Cape Seal 2026, Redding, CA
Commercial Center Safe Routes to School, Shasta Lake, CA
The project includes improvements to numerous existing roads, construction of a new roadway, and an improvement of a 2-acre open space area adjacent to Moody Creek.Work includes pavement widening, curb, gutter, sidewalk, utilities, drainage infrastructure and lighting improvements to Grand Avenue, Shasta Way, Cascade Boulevard and Shasta Dam Boulevard (SR-151).Construction of Wonderland Boulevard including a section consistent with an 84-ft right of way per City of Shasta Lake Construction Standards (COSLCS) including landscaped medians, complete street design components, utility design and coordination (water, wastewater, stormwater, joint utility trench & irrigation), safe crossing infrastructure to open space across Wonderland Boulevard.Improvements to a 2-acre open space adjacent to Moody Creek with improved trails, and signage, and enhanced water-wise landscaping and shade tree planting, green sustainable stormwater infrastructure including bioretention and bioswales