2026 CMP Rehabilitation Project-Pipeline Repairs and Replacement, Aurora, CO
- Owner Reference
- SOQ-26-6141A
- Bid Date
- Jun 9, 2026 at 02:00pm
- Questions Due By
- 05/26/2026 02:00 PM
- Owner
- City of Aurora, CO
- Trades
- CO-22 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The City is seeking to pre-qualify Prime Contractors for Pipeline Repairs and Replacement by direct bury (aka open cut), and Subcontractors for Pipeline Repairs and Replacement by Cured in Place Lining and Fold and Form Lining.
The 2026 Corrugated Metal Pipe (CMP) Rehabilitation Project involves replacing CMP with Reinforced Concrete Pipe (RCP) or lining existing CMPs with Cured In Place Lining with a bid alternate included for Fold and Form Lining. Cured In Place Lining for stormwater sewers is limited to Steam or Water Cured Liners.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 824802 | Published 5/19/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208